On site, one idle machine stops an entire crew.

Earthworks, civil engineering, building: your machinery consumes at the pace of each phase, and a shortage immobilises far more than a single unit.

Sector at a glance

Consumption
By phase
Sites
Mobile
Use
Intensive, intermittent
At stake
Downtime

What the trade demands, and how we answer

  1. 01
    Requirements shift from one phase to the nextEarthworks do not call for the volumes finishing does.

    Volumes set against your actual phases, not a theoretical calendar.

  2. 02
    Sites move and drift away from main roadsAccess is not passable in every season.

    An arrangement discussed site by site, revisited when the work moves.

  3. 03
    Machinery works in burstsIntensive cycles broken by stoppages are hard on the mechanics.

    Lubricant guidance based on the machines in service and how they are used.

  4. 04
    A shifting schedule moves everything elseOne delay ripples through the entire supply calendar.

    A contact who knows your sites and stays reachable when plans change.

The cycle of a site

  1. 01SetupMachinery and working areas put in place
  2. 02EarthworksThe heaviest phase, and the most exposed to a shortage
  3. 03Structural workSustained consumption at a steadier pace
  4. 04FinishingLower requirements, machinery still committed

What derails a supply arrangement

Pitfalls observed in this sector, whoever the supplier is.

  1. 01Ordering at the last moment

    On a remote site, transit time adds to processing time. An order is prepared during the previous phase, not when the tank runs dry.

  2. 02Reasoning in monthly averages

    A site does not consume evenly. An average hides the earthworks peak — precisely when a shortage costs the most.

  3. 03Overlooking on-site storage

    Undersized buffer capacity means multiplying deliveries, or exposing the crew to a stoppage at the first access problem.

What we need to quote

The more precise these are, the more precise the proposal.

Request a quote
  • The nature of the works and the current phase
  • The machinery committed and how hard it works
  • Site location and access conditions
  • Storage capacity available on site
  • The expected duration of the works

Sector questions

Do you deliver to sites away from main roads?
Access governs everything else: we study it site by site before committing, rather than advertising blanket coverage. Describe the location and the state of the approach, and we will tell you what is workable.
How do you handle a site whose schedule slips?
That is the rule rather than the exception. Your contact follows progress and adjusts with you, which means being told early: a delay announced can be managed, a delay discovered has to be absorbed.
Can you advise on lubricant selection?
Yes. We start from the machines actually in service, their age and their working conditions. Send us the equipment list and any manufacturer recommendations you hold.

We start from the nature of the works, the machinery committed and the schedule constraints. The proposal follows from that, rather than from a catalogue.